PROPOSITION C PROJECT
SH 6 at Brooks St Drainage Modifications
$5.825M

SH 6 at Brooks Street experiences localized street ponding exceeding the City's drainage criteria during rain events. In 2022, a drainage study was conducted to analyze the existing drainage system and recommend modifications.

SH 6 at Brooks St

SH 6 at Brooks St

2024 Bond Project

Enlarge storm sewer main line along Garden Ln, Hillstone and Whetrock Ln in Chimneystone.

Funding: 2024 GO Bond - $5,825,000
Project Manager: Sagnik Raha
CIP #: CDR2601

ESTIMATED CONSTRUCTION START
OCT 2027

CURRENT PROJECT PHASE
DESIGN

Learn more about project phases

ESTIMATED COMPLETION
APR 2029