A portion of Lexington Blvd. will be closed September 28 through November 10 for construction activities. The closure will be located immediately in front of the Smart Financial Centre. A detour will be setup to utilize Aberfeldy St. and Tamarind St.
Drivers are asked to be mindful of work crews, expect traffic delays, and when possible, avoid the area to prevent traffic congestion. Visit its.sugarlandtx.gov for more information on Sugar Land travel time data.
Project: CIP MU1304
Engineering Department: 281-275-2780
Lane Wolf (Project Manager): 281-275-2227
Chris Steubing (City Engineer): 281-275-2276
Geoff Cummings (Construction Inspector): 281-275-2163