Austin Parkway Phase I (Williams Trace to Lexington)*
PROPOSITION B PROJECT Austin Parkway Phase I (Williams Trace to Lexington)* $4.5M
The Pavement Management and Maintenance Program (PMMP) was developed to assist in extending the usable life of pavement infrastructure through strategic maintenance practices including pavement replacement.
Austin Parkway
2024 Bond Project
Based on guidance from the PMMP, this project involves street reconstruction and installation of a 10-foot side path on one side extending from Williams Trace to Lexington Blvd.
Funding: 2023 FBC Mobility Bond - $4,000,000; 2024 GO Bond - $4,500,000 Project Manager: Alence Poudel CIP #: CST2602